Planning
We usually do the following work during planning phase.
·Plane Layout and User Requirement Specification(URS) Analysis
·Technical Parameters and Details Guide Confirmation
·Air Cleanliness Zoning and Confirmation
·Bill of Quantity(BOQ) Calculation and Cost Estimation
·Design Contract Confirmation
Design
If you are satisfied with our planning service and want to do design for further understanding, we can move into design phase. We usually divide clean room project into the following 4 parts in design drawings for your better understanding. We have professional engineers to be responsible for each part.
Structure Part
·Clean room wall and ceiling panel
·Clean room door and window
·Epoxy/PVC/High-raised floor
·Connector profile and hanger
HVAC Part
·Air handling unit(AHU)
·HEPA filter and return air outlet
·Air duct
·Insulation material
Electrical Part
·Clean room light
·Switch and socket
·Wire and cable
·Power distribution box
Control Part
·Air cleanliness
·Temperature and relative humidity
·Air flow
·Differential pressure