• page_banner

HOW TO DO CLEANING WORK AFTER COMPLETE DECORATION?

clean room
clean room project
dust free clean room

The dust free clean room removes dust particles, bacteria and other pollutants from room air. It can quickly remove dust particles floating in the air and effectively prevent the generation and deposition of dust particles.

Generally, traditional clean room cleaning methods include: dust removal with dust free mops, dust rollers or dust free wipes. Tests of these methods have found that using dust free mops for cleaning can easily cause secondary pollution in the dust free clean room. So how should we clean it after the construction is completed?

How to clean dust free clean room after the decoration is completed?

1. Pick up garbage on the ground and proceed one by one from inside to outside in the order of the production line. Garbage bins and garbage bins must be dumped on time and inspected regularly. After strict classification according to regulations, they will be transported to the designated garbage room for classification and placement after being inspected by the production line administrator or security guard.

2. The ceilings, air-conditioning vents, headlight partitions, and under the raised floors of the clean room project must be cleaned carefully on time. If the surfaces need to be polished and waxed, antistatic wax must be used, and the plans and procedures must be strictly followed one by one.

3. After the cleaning staff has prepared cleaning and maintenance tools and utensils and placed them at the required address, they can start cleaning. All cleaning supplies need to be taken to the designated cleaning room and stored separately from ordinary tools to avoid cross-contamination, and be sure to place them neatly.

4. After the cleaning work is completed, cleaning staff must store all cleaning utensils and tools in designated cleaning rooms to prevent cross-contamination. They must not dump them randomly in clean room.

5. When cleaning up waste on the road, the cleaning staff must carry out the work one by one from inside to outside according to the order of the production line of the clean room project; when cleaning the glass, walls, storage shelves and object cabinets inside clean room project, they should use cleaning paper or dust free paper to clean from top to bottom.

6. The cleaning staff change into special anti-static clothing, wear protective masks, etc, enter clean room after removing dust in the stainless steel air shower, and place the prepared cleaning tools and supplies at the specified location.

7. When cleaning personnel use dust pushers to carry out dust removal and cleaning services at various locations within the clean room project, they must carefully carry out the work one by one from inside to outside. Dust free paper should be used in time to remove road debris, stains, water stains, etc. Wait for cleaning immediately.

8. For the floor of the dust free clean room, use a clean dust pusher to push and clean the floor carefully from inside to outside. If there is garbage, stains or water marks on the ground, it should be cleaned with a dust free cloth in time.

9. Use the rest and meal time of the production line employees in dust free clean room to clean the floor under the production line, work bench, and chairs.


Post time: Nov-13-2023