PRECAUTIONS FOR LABORATORY CLEAN ROOM CONSTRUCTION

clean room
electronic clean room

Key points of laboratory clean room construction

Before decorating a modern laboratory, a professional laboratory decoration company needs to participate in order to achieve the integration of functionality and aesthetics. First of all, the selection of laboratory decoration sites can be divided into several situations: buildings under construction, civil construction completed, buildings that have not been occupied by personnel, and old buildings that have been used for many years and whose layout meets the establishment conditions.

After the site is decided, the next step is the configuration design, which can usually be divided into: ① Comprehensive configuration design: The prerequisite is sufficient funds and spacious site space. You can plan out laboratories with different properties and categories. Such as R&D room, quality control room, precision instrument room, pharmaceutical room, high-temperature heating room, pre-processing room, sample room, etc. Suitable for large enterprises and research institutions. ②Selective configuration design: Due to financial and site considerations, comprehensive design cannot be included.

Therefore, only suitable products can be selected, and the functions should be concentrated and planned. Suitable for small and medium-sized laboratories. After the above factors are determined, a laboratory design floor plan and planning content can be drawn. Next, the three major factors that will affect the construction quality in the future are considered: ① The construction method of water inlet and drainage pipes. ② The total power consumption and distribution of the laboratory. ③The route of the air duct of the exhaust equipment and the calculation of the exhaust volume of the fan motor.

Three basic contents of laboratory clean room construction

1. Air purification project. One of the biggest problems that plagues laboratory work is how to solve the exhaust problem safely and effectively. In the process of laboratory development, there are often a variety of pipes and gas bottles distributed in laboratory. For some special gas needs to be considered to improve gas supply system engineering, so as to ensure the good development of the laboratory in the future.

2. Regarding the construction of water quality system engineering, the demand for coordination and consistency in the overall construction of modern laboratories has gradually become a global trend, which requires that the pure water system must have integrated design concepts and capabilities. Therefore, the construction of water quality system engineering is also very important for laboratories.

3. Air exhaust system engineering. This is one of the systems with the largest scale and the most extensive impact in the entire laboratory construction project. Whether the ventilation system is perfect will directly affect the health of experimenters, the operation and maintenance of experimental equipment, the experimental environment, etc.

Notes on laboratory clean room construction

In the construction stage of the purification project, civil construction such as indoor floors, hanging items, wall doors and windows, and suspended ceilings are intersected with multiple types of work such as HVAC, power lighting, weak electricity, water supply and drainage and equipment. The step distance is short and the amount of dust is large. In addition to strictly abiding by the process flow, construction personnel are also required to dress neatly when entering the site and are not allowed to bring mud and other debris. They should change their shoes when entering site after work. All decoration materials, installation parts must be cleaned as required before entering the site and reaching the required cleanliness. Before walls, ceilings and other structures are closed, the surfaces of all objects in the enclosed space must be dusted with a vacuum cleaner or wet-cleaned to ensure that no dust accumulates. Operations that generate dust must be carried out in special closed rooms. Rooms within clean room project must be vacuumed regularly to prevent the spread of dust. It is strictly prohibited to bring uncleaned items or items that are prone to mildew into work site.