• page_banner

10 KEY ELEMENTS FOR CLEAN ROOM ACCEPTANCE

clean room
clean room project
clean room construction

Clean room is a kind of project that tests professional abilities and technical skills. Therefore, there are many precautions during construction to ensure quality. Acceptance is an important link in ensuring the quality of clean room project. How to accept? How to check and accept? What are the precautions?

1. Check the drawings

The normal design drawings of the clean room engineering company must comply with construction standards. Check whether the actual construction is consistent with the signed design drawings, including the location and number of fans, hepa boxes, return air outlets, lighting and ultraviolet rays, etc.

2. Equipment operation inspection

Turn on all fans and check whether the fans are operating normally, whether the noise is too loud, whether the current is overloaded, whether the fan air volume is normal, etc.

3. Air shower inspection

The anemometer is used to measure whether the air velocity in air shower meets national standards.

4. Efficient hepa box leak detection

The dust particle counter is used to detect whether the hepa box seal is qualified. If there are gaps, the number of particles will exceed the standard.

5. Mezzanine inspection

Check the hygiene and cleanliness of the mezzanine, the insulation of wires and pipes, and the sealing of pipes, etc.

6. Cleanliness level

Use a dust particle counter to measure and check whether the cleanliness level specified in contract can be achieved.

7. Temperature and humidity detection

Measure the temperature and humidity of the clean room to see if it meets the design standards.

8. Positive pressure detection

Check whether the pressure difference in each room and the external pressure difference meet the design requirements.

9. Detection of the number of air microorganisms by sedimentation method

Use the sedimentation method to detect the number of microorganisms in air to determine whether sterility can be achieved.

10. Clean room panel inspection

Whether the clean room panel is installed firmly, whether the splicing is tight, and whether the clean room panel and ground treatment are qualified. Whether the clean room project meets the standards needs to be monitored at all stages. Especially some hidden projects to ensure the quality of the project. After passing the acceptance inspection, we will train the personnel in clean room to use the clean room project correctly and perform daily maintenance according to regulations, achieving our expected goal of clean room construction.


Post time: Nov-23-2023